Construction Parox received this mandate in January and performed maintenance work, including refurbishing the shipping and receiving docks without affecting operations in the middle of winter. A new freezer was added inside the existing building. Finally, the production plant was expanded by 2,200 sq. ft. on two floors. The challenge of keeping access to deliveries and shipments at all times was met with flying colours.
4900, Molson Street, Montréal
Agri-Food
2013
Work according to plans and specifications